SLRCONSULTING
Independent Impact Assessment Governance

← All documents

obligations_register.csv

_register/obligations_register.csv
# SYNTHETIC TEST DATA - NOT FOR USE IN ANY REAL ASSESSMENT
# Generated by the ESIA governance sandbox. Fictional geography.
# tenant=altus project=serra_verde domain=transmission tier=hard seed=7
obligation_id,regime,instrument,citation,requirement,discipline,evidence_expected,check_classes,status,confidence
eu_eia::ART5-1,eu_eia,EU EIA Directive 2011/92/EU as amended by 2014/52/EU,Article 5(1) and Annex IV,"Provide a description of the project, the likely significant effects, the features to avoid, prevent or reduce them, and a description of reasonable alternatives studied.
",route_and_land,project_description; alternatives_analysis; effects_assessment,mitigation_hierarchy_skip; scope_omission,unverified,
eu_eia::ART3-1,eu_eia,EU EIA Directive 2011/92/EU as amended by 2014/52/EU,Article 3(1),"Identify and assess direct and indirect significant effects on population and human health, biodiversity, land, soil, water, air, climate, material assets, cultural heritage and landscape, and the interaction between them.
",avifauna_and_biodiversity,effects_assessment; interaction_matrix,scope_omission; cross_chapter_contradiction,unverified,
eu_eia::ART5-3,eu_eia,EU EIA Directive 2011/92/EU as amended by 2014/52/EU,Article 5(3),"Ensure the report is prepared by competent experts and is subject to a completeness and quality check by the competent authority.
",legal_and_regulatory,expert_cvs; competence_statement,broken_commitment_chain,unverified,
eu_eia::ART6-2,eu_eia,EU EIA Directive 2011/92/EU as amended by 2014/52/EU,Article 6(2)-(4),"Inform and consult the public early and effectively, with a reasonable timeframe, and take the outcome into account in the decision.
",stakeholder_engagement,consultation_log; public_notice_record,unclosed_grievance,unverified,
eu_eia::ART7,eu_eia,EU EIA Directive 2011/92/EU as amended by 2014/52/EU,Article 7,"Where a project is likely to have significant effects on the environment of another Member State, undertake transboundary consultation.
",legal_and_regulatory,transboundary_screening; notification_record,cumulative_scope_omission; scope_omission,unverified,
eu_eia::ART8A,eu_eia,EU EIA Directive 2011/92/EU as amended by 2014/52/EU,Article 8a(1)(b) and (4),"Attach monitoring measures to the development consent, proportionate to the nature and significance of the effects.
",legal_and_regulatory,monitoring_plan; consent_conditions,broken_commitment_chain,unverified,
transmission::TX-COLLISION,transmission,High-voltage overhead transmission corridor archetype,"Good practice, overhead line design","Assess avian collision and electrocution risk along the full route with species-specific flight height and sensitivity data, and specify marking.
",avifauna_and_biodiversity,flight_activity_survey; collision_risk_model; marking_specification,sampling_gap; broken_commitment_chain,unverified,